Project Description

Timeframe: 2020

Solar panels: 96 096

Piles: 11 753

The Junee 39.4 Solar Farm site is located on the outskirts of Junee NSW. Construction covered 80 hectares of land where over 11 700 piles, 96 000 solar panels, 1161 trackers, and low impact solar photovoltaic technology were installed by Labouroo workforce from March 2020 to August 2020.

  • Displace more than 57,000 tonnes of CO2 emissions annually.
  • Uses low impact solar photovoltaic technology.
  • Doesn’t require water for electricity generation.
  • Significant economic and environmental benefits for regional NSW.

Peak Power: 39.4 MW DC

Households Supplied: 8,500 Homes

Surface: 80 Hectares