Project Description
Timeframe: 2019-2020
Scope- 610 Piles/holes
Labouroo was providing Labourers, operators and driller offsider for Piling and drilling works.
Total of 610 holes drilled and Piles installed.

Labouroo was providing Labourers, operators and driller offsider for Piling and drilling works.
Total of 610 holes drilled and Piles installed.